What’s included in the set?
1 complete kit: 1 L or 0.5 L
1 L: enough to coat one standard bathtub up to 170 cm long in two coats.
0.5 L: enough to coat one standard shower tray up to 90 × 90 cm in two coats.
Included in the kit
Bathtub kit: 1 L:
- EKOPEL ROLL-ON: Component A + Component B, supplied in 2 separate portions for the two coats: Component A: 380 ml × 2Component B: 120 ml × 2
- Thinner: 40 ml
Shower tray kit: 0.5 L:
- EKOPEL ROLL-ON: Component A: 380 ml, Component B: 120 ml
- Thinner: 20 ml
Included in both kits:
- Surface cleaner
- Sandpaper for preparing the bathtub or shower tray
- Wooden stirring stick for mixing the components
- Foam rollers: 2 pcs
- Roller frame: 1 pc
Important: Mix the components for each coat separately, immediately before application. For the 0.5 L kit, use kitchen scales to divide Component A into two equal portions by weight and Component B into two equal portions by weight before mixing.
Technical data
- Total coating volume: 1 L or 0.5 L, depending on the kit
- Coverage: 1 L for one standard bathtub up to 170 cm long; 0.5 L for one standard shower tray up to 90 × 90 cm
- Application: two coats
- Working time: approximately 40 minutes after mixing each portion
- Ready to use after: approximately 24–36 hours at +24 °C
Additional items required or recommended
Not included in the kit:
- Paint tray: 1 pc
- Kitchen scales for dividing the components in the 0.5 L kit
- Masking tape for the edges
- Protective sheeting for the floor and the area around the bathtub or shower tray
- Bin bags
- Paper towels
- Screwdriver for removing the drain cover
- Utility knife for removing old silicone sealant
- Baking soda for cleaning
- Protective gloves
- Protective clothing or clothes you do not mind getting dirty
How to Resurface Your Bathtub
Apply EKOPEL ROLL-ON with a roller in two thin coats. Mix the components for each coat separately, immediately before application.
Technical information:
- 1 L kit: suitable for one standard bathtub up to 170 cm long and 80 cm wide
- 0.5 L kit: suitable for one standard shower tray up to 90 × 90 cm
- Working time: approximately 40 minutes after mixing each portion
- The bathtub or shower tray is ready to use after approximately 24–36 hours at +24 °C
- Do not use cleaning products for the first 7 days after coating
Suitable for:
- Cast iron bathtubs and shower trays
- Steel bathtubs and shower trays
- Fibreglass or acrylic bathtubs and shower trays, provided the base and walls are rigid and do not flex under load
Important for a good result:
- Minimum temperature: +20 °C
- Ideal room temperature: +23–24 °C
- Heat the bathroom from 1 day before coating and maintain a constant temperature throughout application and for the 2 days afterwards. If the room temperature exceeds +26 °C, cool the room before application.
Delivery & Returns
Shipping:
• Orders are prepared within 1 business day
• Delivery time: approx. 1–7 business days, depending on the destination
• Secure packaging for sensitive 2K materials
• Shipment tracking provided immediately after dispatch
• Delivery within Germany, to other EU countries, as well as the UK, Norway, and Switzerland
• For shipments to other countries, please contact us before placing your order
Important notes:
• Please check the goods immediately upon receipt for completeness and any transport damage.
• Store the material in a dry place at room temperature.
Returns:
• Returns of unopened products accepted within 14 days
• Opened or used sets cannot be returned, as these are chemical 2K products
If you have any questions, our support team will be happy to assist you.
Downloads
Technical Data Sheet (PDF) → View PDF
Safety Data Sheet (SDS) → Available upon request
Care instructions for the bathtub (PDF) → View PDF